No Hidden Fees. No Change Orders. Just Clear, 100% Transparent Pricing.

Luxury Pools starting at $58,000 - Built in 6 Weeks or Less!

Flexible Financing for Your Dream Pool

Building your pool shouldn’t mean putting your dreams on hold. That’s why we offer affordable financing options with low monthly payments and terms up to 30 years, making it easier than ever to bring your outdoor living vision to life.


Whether you’re planning a complete backyard transformation or starting with a custom pool, our trusted financing partners help make luxury surprisingly attainable.

• FAST APPROVALS •

• LOW MONTHLY PAYMENTS •

• TERMS UP TO 30 YEARS •

Our Pool Sizes.

Every pool we build is a custom in-ground concrete pool, designed for lasting beauty and strength. Choose from three sizes that balance style, function, and value for your backyard.

Plunge | 8' x 15'

$58,000

Cocktail | 10' x 20'

$65,000

Family | 12' x 25'

$75,000

What's Included in Your Pricing?

Complete Construction of Your Swimming Pool.

  • Permitting & Planning Process
  • Demo & Excavation
  • Steel Reinforcement
  • Plumbing, Electrical, & Gas
  • 4500 PSI Shotcrete (Concrete Shell)
  • Depth: Up to 6 feet
  • Luxury Porcelain Tile & Coping
  • Mini Pebble Interior Finish
  • High Efficient Pump & Filter
  • Saltwater System
  • Automation & Phone Control
  • 2 Micro LED Color Changing Lights
  • Pool School & Start-Up
  • Comprehensive Warranty
  • Built in 6 Weeks or Less!

Optional Upgrades

  • Pool Heater - $6,000
  • Pool Chiller & Heater - $9,500
  • 6 Therapeutic Jets - $4,500
  • Child Safety Fence - $7,000
  • Umbrella Sleeve - $50

Add a Spa to Your Pool

  • 7x7 Spa Integration - $25,000 (Includes heater and jets)

Frequently Asked Questions.

Our commitment to transparency means every prospective customer gets clear, upfront details about our services and an honest assessment of whether their home qualifies for our pricing.

  • Minimum Requirements

    Pool area must be relatively flat with minimal demolition required.


    Cannot be on a slope or hillside.


    Minimum of 4' access required for excavation.


    Pool equipment location relative to the pool cannot exceed 100 feet.


    Gas and electrical meter in relation to the pool equipment cannot exceed 100 feet.

  • Do We Handle the Permit Process?

    Yes, we handle all permitting and planning for your project including working with your HOA. 


    *Fee for permits are not included in our pricing and are paid directly by the homeowner.

  • Financing?

    Yes we offer financing. To learn more book a consultation with our team to get started.

  • Additional Information

    HOA/City Plans and Engineering fees are not included. Fee are paid directly to the City by the homeowner. Typical permits fees range between $500 - $1,500.


    Soils report - $4,500 (If city requires it).


    6 week construction window starts once permits are received.


    Average timeline permit approval for most cities is 2 to 6 weeks.


    Rain delays, inspection delays, change orders, third party delays, and payment delays may increase construction timeline.


    Pool equipment and automation by Hayward.


    Saltwater system comes standard but may be excluded if desired.


    Mini pebble finish by Stonescapes.


    Porcelain tile is outdoor and anti-slip rated.


    Stairs, benches, and baja shelf are customizable.

  • Warranty Information

    Pool Shell - Lifetime


    Tile & Coping - 1 Year


    Mini Pebble - 10 Years


    Pool Equipment - 3 Years

  • Service Area

    Modul currently services the following areas:


    Los Angeles

    Orange County

    Inland Empire

    San Diego

    Coachella Valley

Modul vs. Budget Builders

We build luxury pools with premium materials and uncompromising engineering, while the budget guys cut corners with cheap finishes and minimum effort.

Modul Pools

Finish Materials

Luxurious Waterfall Edge Porcelain Coping to Waterline Tile.


Interior Finish

High Quality Stonescapes Mini Pebble. (15-25 year lifespan)


Equipment

High Efficiency Equipment + Autofill + Automation & Phone Controls + Micro LED Color Changing Lights + Salt System.

All Comes Standard in Pricing.


Structural Quality

Optimal Engineering:

#4 Steel Rebar, 4500 psi Shotcrete, and 2.5" Plumbing.


Construction Timeline

5-6 Weeks.

Budget Builders

Finish Materials

Cheap Concrete Coping & Outdated Ceramic Tile


Interior Finish

Basic Plaster (7-10 year lifespan)


Equipment

Standard Equipment and Pool Light


Structural Quality

Minimum Engineering Requirements:

#3 Steel Rebar, 3000 psi Shotcrete, and 1.5" Plumbing.


Construction Timeline

8-12 Weeks.

What Areas Do We Service?

Southern California Service Area.

  • Los Angeles
  • Orange County
  • Inland Empire
  • San Diego
  • Coachella Valley

Due to new laws and regulations, pricing on all pools will be increasing starting January 01, 2026.

Get started today to secure our 2025 pricing.

Get Your Free Consultation Today!

Book Your Appointment

By clicking "Send" you agree our privacy policy and to be contacted via email and or phone. We do not sell or share your personal data.

How We Build Modul Pools?

Week 1

Excavation, Steel, and Plumbing.

The first phase begins with excavating the area where your pool will take shape. Once the ground is prepared, we install the steel reinforcement framework that gives the pool its strength and structure. At this stage, all plumbing lines are run, and essential equipment is set in place to support the pool’s future operation.

Modul Pools. Excavation, steel, and plumbing phase.
Modul Pools. Shotcrete phase

Weeks 2-3

Shotcrete

Next comes one of the most critical steps: forming the concrete shell. We use high-strength 4500 psi shotcrete, applied under pressure to create a durable, watertight structure for your pool. After the shell is completed, it requires a curing period and proper maintenance to ensure maximum strength and longevity.

Weeks 3-4

Luxury Waterfall Edge Tile & Coping

The Finishing Touch That Defines Your Pool

Once the concrete shell has fully cured, the artistry begins. Our masonry team carefully installs the coping and tile, the details that frame and define your pool’s design. This is the moment when the transformation really comes to life.


At Modul, every pool is finished with premium porcelain tile, expertly mitered at 45 degrees. This technique creates a seamless waterfall edge that flows from coping to waterline tile, giving your pool a timeless and luxurious look you won’t find in standard builds.

Why We Never Use Concrete Coping?

After building thousands of pools, we’ve seen one thing again and again: concrete coping is a problem waiting to happen.


  • Discoloration: Sun, water, and chemicals quickly cause uneven fading.
  • Cracking: Shifts in soil and natural expansion often lead to fractures.
  • High Maintenance: Frequent sealing and patching become necessary just to keep it looking presentable.


These issues aren’t just common, they’re almost inevitable. That’s why we’ve eliminated them from our construction process.

Modul Pools. Tile, Coping, and Pebble pahse
Modul Pools. Tile, Coping, and Pebble pahse

Weeks 3-4

Pebble Interior Finish

The Final Layer: Beauty That Lasts

The last step in bringing your pool to life is applying the interior finish. At Modul, we use a high-quality mini pebble surface, a blend of natural stones that creates a smooth, durable, and visually striking finish. This final layer isn’t just about looks; it’s engineered to stand up to decades of use while keeping your water sparkling and inviting.

Why We Don’t Offer Plaster

While traditional plaster is the cheapest option available, we’ve chosen not to offer it and here’s why:


  • Short lifespan: Plaster typically needs to be redone within 5–7 years due to etching, staining, or roughness.
  • Maintenance headaches: It’s far more vulnerable to chemical imbalance, requiring strict upkeep just to avoid damage.
  • Appearance issues: Over time, plaster discolors, spots, and becomes rough underfoot, diminishing both comfort and beauty.



We’ve seen too many homeowners spend more time and money resurfacing a plaster pool than they ever expected.

Weeks 5-6

Project Completion

With the interior finish complete, your pool is ready to be filled with water. Our team carefully balances and starts up the system, ensuring everything runs smoothly.


We also walk you through the operation of your pool equipment so you feel confident maintaining it.


At this point, your pool is officially ready for you and your family to enjoy.

Book Your Free Consultation Today.

Ready to get started? Book a free consultation today to see if your home qualifies.

Book Your Appointment

By clicking "Send" you agree our privacy policy and to be contacted via email and or phone. We do not sell or share your personal data.

Smarter Pools. Happier Customers.

Testimonials

Rated 5/5 by Homeowners

Amanda T.
San Diego

From Design to Dive in Just Weeks.

"I couldn’t believe how fast and easy the process was. Clear pricing, beautiful options, and no surprises. We were swimming in under six weeks!"

Luxury Look Without the Luxury Price.

"Our pool looks like something out of a magazine and it didn’t break the bank. The curated tile and pebble choices made it simple but still felt totally custom."

David R.

Los Angeles

Zero Stress. All Reward.

"This was hands down the smoothest construction project we’ve ever done. They told us exactly what to expect, stuck to it, and delivered an incredible pool ahead of schedule."
Michelle K.
Orange County

Let's Build Your Modul

Request Your Free Consultation

Book Your Appointment

By clicking "Send" you agree our privacy policy and to be contacted via email and or phone. We do not sell or share your personal data.

Frequently Asked Questions

Are there any restrictions?

Pool area must be relatively flat with minimal demolition required.


Cannot be on a slope or hillside.


Minimum of 4' access required for excavation.


Pool equipment location relative to the pool cannot exceed 100 feet.


Gas and electrical meter in relation to the pool equipment cannot exceed 100 feet.

Are there any upgrades or add-ons?

We have multiple optional upgrades available for customers.


Pool Heater - $6,000

Pool Chiller & Heater - $9,500

6 Therapeutic Jets - $4,500

Child Safety Fence - $7,000

Saltwater Upgrade - $0

Umbrella Sleeve - $50

Can I add a spa to my pool?

Yes. We have an optional spa integration add-on option for $25,000. Includes gas heater and jets.


The spa is fully integrated within the pool’s existing perimeter. It is not built as a partial extension or outside addition. Instead, the spa is designed to fit entirely inside the pool’s footprint, which means selecting the spa upgrade does not increase the pool’s total perimeter or overall area.

What kind of pool is Modul?

Modul is a custom in-ground concrete pool built with 4500 psi shotcrete.

Are there financing options?

Yes. We have partnered with Lyon Financial to finance our customers.

What areas is Modul available in?

Modul is currently available in most cities within Southern California and New York.

Are permits included in pricing?

While we handle the permitting and planning process, permit fees are not included in the price of the pool. Fees are paid directly to the City by the homeowner.