Get Yours Today for $65,000 - Built in 6 Weeks or Less.

10' x 20' Cocktail Pool

The Perfect Size Pool for Relaxing & Entertaining.

Scroll below to learn and explore more

What's Included in $65,000 Price?

Complete Construction of Your 10' x 20' Cocktail Pool.

  • Demo & Excavation
  • Steel Reinforcement
  • Plumbing, Electrical, & Gas
  • 4500 PSI Shotcrete (Concrete Shell)
  • Luxury Porcelain Tile & Coping
  • Mini Pebble Interior Finish
  • High Efficient Equipment
  • Automation & Phone Control
  • 2 Micro LED Color Changing Lights
  • Pool School & Start-Up
  • Comprehensive Warranty
  • Built in 6 Weeks or Less!

What Else Should I Know?

Our commitment to transparency means every prospective customer gets clear, upfront details about our services and an honest assessment of whether their home qualifies for our pricing.

  • Minimum Requirements

    Pool area must be relatively flat with minimal demolition required.


    Cannot be on a slope or hillside.


    Minimum of 4' access required for excavation.


    Pool equipment location relative to the pool cannot exceed 100 feet.


    Gas and electrical meter in relation to the pool equipment cannot exceed 100 feet.

  • Optional Upgrades

    Pool Heater - $6,000


    Pool Chiller & Heater - $9,500


    6 Therapeutic Jets - $4,500


    Child Safety Fence - $7,000


    7x7 Spa Intergration - $25,000 (Includes gas heater and jets)


    Saltwater Upgrade - $0


    Umbrella Sleeve - $50

  • Additional Information

    HOA/City Plans and Engineering fees are not included. Fee are paid directly to the City by the homeowner. Typical permits fees range between $500 - $1,500.


    Soils report - $4,500 (If city requires it).


    6 week construction window starts once permits are received.


    Average timeline permit approval for most cities is 2 to 6 weeks.


    Rain delays, inspection delays, change orders, third party delays, and payment delays may increase construction timeline.


    Pool equipment and automation by Hayward.


    Saltwater system comes standard but may be excluded if desired.


    Mini pebble finish by Stonescapes.


    Porcelain tile is outdoor and anti-slip rated.


    Stairs, benches, and baja shelf are customizable.

  • Warranty Information

    Pool Shell - Lifetime


    Tile & Coping - 1 Year


    Mini Pebble - 10 Years


    Pool Equipment - 3 Years

What Areas Do We Service?

Southern California Service Area.

  • Los Angeles
  • Orange County
  • Inland Empire
  • San Diego
  • Coachella Valley

New York Service Area.

  • Ulster County
  • Orange County
  • Dutchess County
  • Sullivan County
  • Putnam County
  • Westchester County
  • Rockland County

Smarter Pools. Happier Customers.

Testimonials

Rated 5/5 by Homeowners

Amanda T.
Southern California

From Design to Dive in Just Weeks.

"I couldn’t believe how fast and easy the process was. Clear pricing, beautiful options, and no surprises. We were swimming in under six weeks!"

Luxury Look Without the Luxury Price.

"Our pool looks like something out of a magazine and it didn’t break the bank. The curated tile and pebble choices made it simple but still felt totally custom."

David R.

New York

Zero Stress. All Reward.

"This was hands down the smoothest construction project we’ve ever done. They told us exactly what to expect, stuck to it, and delivered an incredible pool ahead of schedule."
Michelle K.
Southern California

Book Your Free Consultation Today.

Ready to get started? Book a free consultation today to see if your home qualifies.

Book Your Appointment

By clicking "Send" you agree our privacy policy and to be contacted via email and or phone. We do not sell or share your personal data.

Explore All Our Pricing & Packages.

Choose a Modul that best fits your budget and needs, and explore your optional upgrades.
Modul .01

$58,000

8' x 15' Concrete Pool


Depth: 3'6" - 5'


4500 PSI Shotcrete

Mini Pebble Interior Finish

Porcelain Coping & Tile Finish

2 Micro LED Color Lights

Automation


Energy Efficient Equipment


Price includes complete construction of pool. Excavation, steel, plumbing, shotcrete, tile & coping, pebble, and equipment installation.

*Does not include decking.

*Does not include permit fees.






  • Minimum Requirements

    Pool area must be relatively flat with minimal demolition required.


    Cannot be on a slope or hillside.


    Minimum of 4' access required for excavation.


    Pool equipment location relative to the pool cannot exceed 100 feet.


    Gas and electrical meter in relation to the pool equipment cannot exceed 100 feet.

  • Optional Upgrades

    Pool Heater - $6,000


    Pool Chiller & Heater - $9,500


    6 Therapeutic Jets - $4,500


    Child Safety Fence - $7,000


    Saltwater Upgrade - $0


    Umbrella Sleeve - $50

  • Additional Information

    HOA/City Plans and Engineering fees are not included. Fee are paid directly to the City by the homeowner.


    Soils report - $4,500 (If city requires it).


    6 week construction window starts once permits are received.


    Rain delays, inspection delays, change orders, third party delays, and payment delays may increase construction timeline.


    Pool equipment and automation by Hayward.


    Saltwater system comes standard but may be excluded if desired.


    Mini pebble finish by Stonescapes.


    Porcelain tile is outdoor and anti-slip rated.


    Stairs and benches are customizable.

Modul .02

$65,000

10' x 20' Concrete Pool


Depth: 3'6" - 6'


4500 PSI Shotcrete

Mini Pebble Interior Finish

Porcelain Coping & Tile Finish

2 Micro LED Color Lights

Automation


Energy Efficient Equipment


Price includes complete construction of pool. Excavation, steel, plumbing, shotcrete, tile & coping, pebble, and equipment installation.

*Does not include decking.

*Does not include permit fees.






  • Minimum Requirements

    aPool area must be relatively flat with minimal demolition required.


    Cannot be on a slope or hillside.


    Minimum of 4' access required for excavation.


    Pool equipment location relative to the pool cannot exceed 100 feet.


    Gas and electrical meter in relation to the pool equipment cannot exceed 100 feet.

  • Optional Upgrades

    Pool Heater - $6,000


    Pool Chiller & Heater - $9,500


    6 Therapeutic Jets - $4,500


    Child Safety Fence - $7,000


    Saltwater Upgrade - $0


    Umbrella Sleeve - $50


    7' x 7' Spa Integration - $25,000 (Includes Heater & Jets)

  • Additional Information

    HOA/City Plans and Engineering fees are not included. Fee are paid directly to the City by the homeowner.


    Soils report - $4,500 (If city requires it).


    6 week construction window starts once permits are received.


    Rain delays, inspection delays, change orders, third party delays, and payment delays may increase construction timeline.


    Pool equipment and automation by Hayward.


    Saltwater system comes standard but may be excluded if desired.


    Mini pebble finish by Stonescapes.


    Porcelain tile is outdoor and anti-slip rated.


    Stairs and benches are customizable.

Modul .03

$75,000

12' x 25' Concrete Pool


Depth: 3'6" - 6'


4500 PSI Shotcrete

Mini Pebble Interior Finish

Porcelain Coping & Tile Finish

2 Micro LED Color Lights

Automation


Energy Efficient Equipment


Price includes complete construction of pool. Excavation, steel, plumbing, shotcrete, tile & coping, pebble, and equipment installation.

*Does not include decking.

*Does not include permit fees.






  • Minimum Requirements

    Pool area must be relatively flat with minimal demolition required.


    Cannot be on a slope or hillside.


    Minimum of 4' access required for excavation.


    Pool equipment location relative to the pool cannot exceed 100 feet.


    Gas and electrical meter in relation to the pool equipment cannot exceed 100 feet.

  • Optional Upgrades

    Pool Heater - $6,000


    Pool Chiller & Heater - $9,500


    6 Therapeutic Jets - $4,500


    Child Safety Fence - $7,000


    Saltwater Upgrade - $0


    Umbrella Sleeve - $50


    7' x 7' Spa Integration - $25,000 (Includes Heater & Jets)

  • Additional Information

    HOA/City Plans and Engineering fees are not included. Fee are paid directly to the City by the homeowner.


    Soils report - $4,500 (If city requires it).


    6 week construction window starts once permits are received.


    Rain delays, inspection delays, change orders, third party delays, and payment delays may increase construction timeline.


    Pool equipment and automation by Hayward.


    Saltwater system comes standard but may be excluded if desired.


    Mini pebble finish by Stonescapes.


    Porcelain tile is outdoor and anti-slip rated.


    Stairs and benches are customizable.

Our Project Pipeline is Filling Up Fast. Reserve Your Spot Today.

Availability for new pool projects is filling up quick, and once our calendar is booked, the next opportunity may be months away.


Don’t let another year slip by without the luxury pool you’ve always envisioned. Give your family the backyard they deserve and start creating unforgettable memories with a Modul pool.


Secure your consultation today before our schedule closes.


Request Your Free Consultation

Book Your Appointment

By clicking "Send" you agree our privacy policy and to be contacted via email and or phone. We do not sell or share your personal data.

How We Build Modul Pools?

Phase 01:

Excavation, Steel, and Plumbing.

The first phase begins with excavating the area where your pool will take shape. Once the ground is prepared, we install the steel reinforcement framework that gives the pool its strength and structure. At this stage, all plumbing lines are run, and essential equipment is set in place to support the pool’s future operation.


Week 1

Modul Pools. Excavation, steel, and plumbing phase.
Modul Pools. Shotcrete phase

Phase 02:

Shotcrete

Next comes one of the most critical steps: forming the concrete shell. We use high-strength 4500 psi shotcrete, applied under pressure to create a durable, watertight structure for your pool. After the shell is completed, it requires a curing period and proper maintenance to ensure maximum strength and longevity.


Week 2-3

Phase 03:

Tile, Coping, and Pebble

Once the shell has cured, our masonry team gets to work. Coping and tile are installed to frame and define the pool’s design, and this is when the visual transformation really begins. Afterward, we apply the pebble finish to the pool’s interior, creating the final surface that combines beauty with long-lasting durability.



Week 3-4

Modul Pools. Tile, Coping, and Pebble pahse

Phase 05:

Project Completion

With the interior finish complete, your pool is ready to be filled with water. Our team carefully balances and starts up the system, ensuring everything runs smoothly. We also walk you through the operation of your pool equipment so you feel confident maintaining it.

At this point, your pool is officially ready for you and your family to enjoy..


Week 4-6

Let's Build Your Modul

Request Your Free Consultation

Book Your Appointment

By clicking "Send" you agree our privacy policy and to be contacted via email and or phone. We do not sell or share your personal data.

Our Story

OC Poolscapes has spent years designing and building some of the most high-end custom pools in Southern California. But as costs rose and timelines stretched longer, we saw a gap in the market and an unmet need for homeowners who wanted the look and quality of a luxury pool, but without the overwhelming process or six-figure price tag.


To solve that problem, we created Modul Pool Systems.


Born from our experience in custom design, Modul takes the best parts of high-end pool building, elegant finishes, beautiful shapes, & solid craftsmanship and packages them into a faster, smarter, and more affordable solution.


With pre-designed pool shapes, curated finish options, and transparent pricing, Modul gives homeowners a simple and stress-free path to owning a modern, in-ground pool. No drawn-out timelines, no endless decisions, and absolutely no hidden fees.


Whether you're looking for a personal plunge pool, a stylish Airbnb upgrade, or a small backyard oasis, Modul delivers luxury made for real life, built in 6 weeks or less by OC Poolscapes.

Frequently Asked Questions

Are there any restrictions?

Pool area must be relatively flat with minimal demolition required.


Cannot be on a slope or hillside.


Minimum of 4' access required for excavation.


Pool equipment location relative to the pool cannot exceed 100 feet.


Gas and electrical meter in relation to the pool equipment cannot exceed 100 feet.

Are there any upgrades or add-ons?

We have multiple optional upgrades available for customers.


Pool Heater - $6,000

Pool Chiller & Heater - $9,500

6 Therapeutic Jets - $4,500

Child Safety Fence - $7,000

Saltwater Upgrade - $0

Umbrella Sleeve - $50

Can I add a spa to my pool?

Yes. We have an optional spa integration add-on option for $25,000. Includes gas heater and jets.


The spa integration is built within the confines of the perimeter of your pool model. The spa upgrade does not extend the total perimeter or total area of the pool.

What kind of pool is Modul?

Modul is a custom in-ground concrete pool built with 4500 psi shotcrete.

Are there financing options?

Yes. We have partnered with Lyon Financial to finance our customers.

What areas is Modul available in?

Modul is currently available in most cities within Southern California and New York.

Are permits included in pricing?

Permit fees are not included in the price of the pool. Fees are paid directly to the City by the homeowner.