Yes, Modul Pools Are Built Using Shotcrete Concrete
Every Modul Pool is a site-built concrete pool, constructed with:
- Steel reinforcement
- 4500 PSI shotcrete concrete
- On-site forming and spraying
-
Shotcrete is a widely used method in professional concrete pool construction and offers durability, strength, and longevity.
Are Modul Pools Real Concrete Pools?
What is a Modul Pool?
What “Modular” Actually Means
The term “Modul” refers to:
- Pre-designed pool sizes
- Defined finish selections
- Clear pricing structures
- It does not mean prefabricated shells, drop-in pools, or non-concrete construction.
Why Shotcrete Matters
Shotcrete allows:
- Structural integrity
- Custom shaping
- Long-term durability
- Proper bonding with tile and finishes
-
This is the same core structural method used in traditional gunite pool construction.
Common Misunderstandings About Faster Builds
Some assume faster construction means lower quality. In reality, speed comes from:
- Defined scopes
- Pre-selected materials
- Streamlined scheduling
- Professional project management
-
Quality and speed are not mutually exclusive.
Modul Pool Construction Process.
Step 01: Excavation
Step 02: Steel/Rebar
Step 03: Plumbing
Step 04: Shotcrete
Step 05: Tile & Coping
Step 05: Pebble
Step 06: Your First Swim
We believe clarity upfront creates better projects and happier clients.
See Exactly What You’re Paying For.
Many budget builders advertise low prices, but those numbers often come from cutting corners. At Modul, we do the opposite; premium materials, higher standards, and quality that’s built to last.
| Features | Modul Luxury Pools | Budget Builders |
|---|---|---|
| Structural Quality |
#4 Rebar, 4500 psi Shotcrete, and 2.5" Plumbing.
|
#3 Rebar, 3000 psi Shotcrete, and 1.5" Plumbing.
|
| Coping |
Luxury Porcelain Tile
|
Basic Concrete
|
| Waterline Tile |
Luxury Porcelain Tile
|
Outdated Ceramic Tile
|
| Interior Finish |
High Quality Mini Pebble
|
Cheap White Plaster
|
| Lights |
(2) LED Color Lights
|
(1) Standard White Light
|
| Pump |
High Efficiency Variable Speed
|
Single Speed
|
| Automation |
Omni 4-Way Automation with Phone Controls
|
No Automation
|
| Autofill |
Included
|
Not Included
|
| Construction Timeline |
5-6 Weeks
|
8-16 Weeks
|
| Total Job Costs |
Upfront, 100% Transparent Pricing
|
Hidde Fees and Up Charges
|
Where Do We Build?
Locations
Orange County
Orange County, CA
San Diego
San Diego, CA
Los Angeles
Los Angeles, CA
Inland Empire
Riverside, CA
Coachella Valley
Palm Springs, CA
Ventura County
Santa Barbara, CA
Sacramento
Sacramento, CA
Our Construction Window is Filling Up Fast!
Availability is limited, and projects are scheduled on a first-come, first-served basis. Book Your Consultation Today to Get Started.
Experience the Way Pool Building Should Be.
Request Your Pool Construction Consultation Today.
Book Your Appointment
We will get back to you as soon as possible.
Please try again later.
By clicking "Send" you agree to be contacted electronically via; text, phone call, or email.
*We NEVER SELL OR SHARE your personal information.





